Close Menu
    News of PersiaNews of Persia
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    News of PersiaNews of Persia
    Home » 7.8 GWh Saudi Arabia ESS Project Officially Connected to the Grid
    PR Newswire

    7.8 GWh Saudi Arabia ESS Project Officially Connected to the Grid

    December 18, 2025
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    HEFEI, China, Dec. 18, 2025 /PRNewswire/ — The Kingdom of Saudi Arabia has officially completed grid connection of its landmark energy storage system (ESS) project with the nameplate capacity of 7.8GWh. Once fully energized, it will become the world’s largest operational battery energy storage system (BESS), marking a major milestone in the advancement of renewable energy in the Middle East.

    Sungrow Saudi Arabia 7.8 GWh Project

    The project spans three sites located in the southwestern regions of KSA, Najran, Khamis Mushait, and Madaya. Sungrow, the equipment provider, played a pivotal role by completing the manufacturing of over 1,500 PowerTitan 2.0 systems in just 58 days and delivering the entire project within a very challenging timeline.

    The PowerTitan 2.0 system features an all-in-one AC-DC block design, integrating embedded power conversion systems (PCS), pre-assembled battery container, medium voltage transformers and RMU, and comprehensive factory testing. This streamlined configuration significantly reduces onsite installation time. Additionally, Sungrow has deployed a dedicated local service team of professionals based in Saudi Arabia to support installation, commissioning, and grid connection.

    This 7.8 GWh project marks the beginning of large-scale energy storage deployment in the Middle East. The project’s annual charging and discharging capacity is expected to reach 2.2 billion kWh, which can meet the annual electricity needs of 400,000 households in Saudi Arabia.

    The project contributes significantly to Saudi Arabia’s Vision 2030 and supports the global transition toward clean and sustainable energy.

    About Sungrow

    Sungrow, a global leader in renewable energy technology, has pioneered sustainable power solutions for over 28 years. As of June 2025, Sungrow has installed 870 GW of power electronic converters worldwide. The Company is recognized as the world’s most bankable PV inverter and energy storage company (BloombergNEF). Its innovations power clean energy projects across the globe, supported by a network of 520 service outlets guaranteeing excellent customer experience. At Sungrow, we’re committed to bridging to a sustainable future through cutting-edge technology and unparalleled service. For more information, please visit: https://www.sungrowpower.com/en

    Logo

    Photo – https://mma.prnewswire.com/media/2848593/7_8.jpg
    Logo – https://mma.prnewswire.com/media/1344575/Logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/7-8-gwh-saudi-arabia-ess-project-officially-connected-to-the-grid-302645680.html

    Related Posts

    Legend Robot Unveils How Its Mobile Continuous Spraying Technology Accelerates Vision 2030 Gigaprojects at Big 5 Saudi

    August 25, 2026

    Dewan Announces Two Strategic Managing Director Appointments as Firm Evolves Leadership Structure to Support Continued Growth

    August 25, 2026

    LG ELECTRONICS BRINGS HIGH-EFFICIENCY LIVING TO MORE CONSUMERS AT IFA 2026

    August 25, 2026

    Robo.ai Inc. Reports First Half 2026 Financial Results

    August 24, 2026

    Galileo Robotics Unveils Galileo X at WRC 2026, Breaking Conventional Form Factors with Its “Embodied Ground Mobility System”

    August 24, 2026

    New Taipei’s Tech Ecosystem Leaps into the Middle East: 20 Companies to Showcase at LEAP 2026

    August 23, 2026
    Latest News

    Brent crude steadies after 2% drop amid Iran sanctions

    August 25, 2026

    Alibaba raises HK$80 billion for AI and cloud growth

    August 24, 2026

    South Korea starts first Arctic container ship trial

    August 24, 2026

    Australian team finds new way to tackle triple-negative breast cancer

    August 22, 2026
    © 2026 News of Persia | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.